The water line is in, buried and cleaned up. Next spring I will sprinkle some grass seed over the filled in trench and I will soon be back to mowing it.
The concrete work still has to be done but I was referred to a good concrete guy who specializes in small jobs. He has already torn up the remains of the old sidewalk and will be pouring the new one in a day or two, depending on weather. He will also repair a small section of the retaining wall beside the driveway that got damaged by the backhoe. The original plan was to just patch the sidewalk but he informed me that his minimum charge would replace the whole thing. Nice. The retaining wall repair will be billed directly to the plumbing company because it was their fault. the result of having to dig in a very confined area.
This is all covered by insurance, less my $1,000 deductible.
Subscribe to:
Post Comments (Atom)
Then you can find some other way to get into trouble.
ReplyDeleteAnd you know there will be something else Paula!
DeleteI bet it is great to get things back in order. Those jobs make me crazy.
ReplyDelete